Project Information
- Client: Atomenergoproekt
- General Designer: Atomenergoproekt
- Contractor: Mostostroy No. 6
- Contract Value: $5,000,000
- Finish Date: August 2015
No. 2 of NVNPP-2
A complex of construction and installation works for the construction of the evaporative cooling tower of block 2 of NVNPP-2 and the cold water outlet channel of the cooling tower (turnkey).
- 3500 Tons Steel Assembly Works
- 20.000 m3 Reinforced Concrete Works
- Height of structures - 171 m
- Diameter at ground level - 135.31 m
- Irrigation area - 11.000 m2
List of works, construction of a foundation pit, construction of a pile foundation, installation of a catchment slab, installation of hot water supply channels, balancing channels, installation of a circular foundation, installation of lifting shafts includes. , installation of the cooling tower shell, installation of internal supporting structures, installation of reinforced concrete columns of the supporting column, installation of technological equipment of the cooling tower.